SOFTWARE PROJECT MANAGEMENT

1. You have been appointed a Project manager for a major software products company. Your job is to manage the development of the next generation version of its widely used word-processing software. Because new revenue must be generated, tight deadlines have been established and announced. What team structure would you choose and why? What software process model(s) would you choose and why?
2. You have been asked to develop a small application that analyzes each course offered by a university and reports the average grade obtained in the course (for a given term). White a statement of scope that bounds this problem.
3. Use the COCOMO II Model I to estimate the effort required to build software for a simple ATM that produces 12 screens, 10 reports, and will require approximately 80 software components, Assume average complexity and average developer/environment maturity. Use the application composition model with object points.
4. Develop a spreadsheet model that implements one or two of the estimation techniques described in this chapter. Alternatively, a acquire one or more on-line models for software project estimation from web-based sources.
5. A system has 12 external inputs, 24 external outputs, fields 30 different external queries, manages 4 internal logical files, and interfaces with 6 different legacy systems (6 EIFs). All of these data are of average complexity, and the overall system is relatively simple. Compute FP for the system.
6. Give at least three examples in which black-box testing might give the impression that everything’s OK, while white vox tests might uncover an error. Give at least three examples in which white-box testing might give the impression that “everything’s OK,” while black-box tests might uncover an error.


Software Project Management


1.         How does the requirement process can be explained?
2.         What is step wise project planning? Draw a diagram for an overview of stepwise planning.
3.         i) Write the basis for software estimating
4.         What is network planning model? How to formulate network model?
5.         Explain the method of estimating the duration of an activity.
6.         Explain top-down project schedule plan.
7.         Explain the functions and responsibilities of software configuration management.
8.         Discuss in detail any one tool for project management.
9.         Discuss risk management in software development.
10.  Write a case study of a Software Project Management System for an automated education system which contains the requirement, gathering, planning, Implementation, Test Cases and Staffing.


Software Project Management


1.      What is LOC? Explain disadvantage of this method as a measure of size of a software. Compare Halstead’s length and volume measures of size with LOC measure by giving suitable example.
2.     What is the use of the following tools in Software Project Scheduling? Also, mention its significance:

i)  WBS

ii) CPM

iii)PERT charts
3.     Suppose you are developing a software product in the organic mode. You have estimated the size of the product to be about 1,00, 000 lines of code. Compute the nominal effort and development time.
4.     What is a Software Process? Why it is required to model a software process? List various tools available for process modeling. Explain any one tool with an example.
5.     Define term resource in Project Management. What types of resources are required to develop a software project? Explain the significance of resource allocation phase.
6.     What is significance and role of Project Closure Analysis in Software Project Management? Write steps to perform closure analysis.
7.      What is Software Reliability? How it is different from Hardware Reliability?
8.    Why is it important to track the progress of a project? Explain various monitoring and controlling techniques to track the project progress.